top of page
Joint Sealant Failure2.png

Joint Sealant Failure

Joint and Crack Resealing.JPG
Joint and Crack Resealing2_edited.jpg
PCCP Joint sealing cropped.JPG

If you have joint sealant failure, you need to perform:

 

Joint/Crack Resealing

​

Uncontrolled water ingress, especially water from a pavement’s surface, contributes to multiple types of pavement distress. It can lead to spalling, base or subgrade softening, dowel bar corrosion, pavement joint blow-ups and/or materials-related distress.


For many concrete pavements, proactively sealing or filling transverse and longitudinal joints and cracks to reduce water penetration improves long-term pavement performance. In addition to limiting the entry of water, joint sealing can reduce the entry of incompressibles into the joint reservoir that exert pressure on the pavement. Performed alone, joint resealing
is a maintenance activity. However, it is also an important part of the concrete pavement preservation (CPP) toolbox.


There are two basic approaches to joint treatment (other than leaving the joint open): joint filling and joint sealing. Joint sealing involves a foam backer rod and more rigorous preparation of a sealant reservoir than filling, which often involves simply filling up a diamond saw cut joint with sealant material after minimal preparation. Joint filling may be appropriate when the reservoir is narrow and difficult to prepare, but full adhesion of the filler may be difficult to achieve, resulting in less protection from moisture penetration. In CPP projects where joints have previously been sealed, resealing them is important.

​

See also our industry partner website Seal/No Seal to learn more about the benefits of sealing joints.

Resources

CPR: Rebuilt to Last: Concrete Patching and Maintenance for I-84 in Box Elder County, UT

The Utah Department of Transportation (UDOT) carefully considered a variety of options to repair the 20-year-old concrete pavement on I-84 in Box Elder, UT. The methods selected included dowel bar retrofit (DBR), diamond grinding, full depth repair, partial depth repair, slab jacking and joint resealing. This newly rehabilitated highway will provide a safe, smooth and durable surface for many years to come.

Resource Type:

Resource Sections:

Resource Techniques:

Resource Issues:

Case Study

Highway

Concrete Pavement Preservation and Restoration, Diamond Grinding, Dowel Bar Retrofit, Full & Partial Depth Repair, Joint and Crack Resealing, Slab Stabilization

Smoothness, Structural/Material Issues

CPR: Rebuilt to Last: Eielson Air Force Base, Fairbanks, AK

A runway section at Eielson Air Force Base in Fairbanks, Alaska, saw rehabilitation through diamond grinding and joint resealing. Diamond grinding restored the runway's condition, and joint resealing prevented water infiltration. These methods extended the runway's service life. The project, which saved significant time and money, was completed almost a month ahead of schedule, ensuring a safer and more efficient surface for the 354th Fighter Wing's operations.

Resource Type:

Resource Sections:

Resource Techniques:

Resource Issues:

Case Study

Airport/Airfield

Diamond Grinding, Diamond Grooving, Full & Partial Depth Repair, Joint and Crack Resealing

Friction/Safety

bottom of page